Bespoke structures are architectural and structural pieces designed, engineered and fabricated for one specific project, because no standard product or pre-engineered system fits the geometry, the span, the site or the design intent. In Saudi Arabia they usually mean bespoke steel structures such as canopies, pergolas, feature staircases, pedestrian bridges, skylight frames, signage and gateways, delivered through nine stages: brief, design development, structural engineering, shop drawings, mock-ups, fabrication, surface treatment, installation and handover.
Saudi projects produce a lot of them, from custom steel fabrication for a single villa canopy to architectural steel structures for a whole district. Hotel entrance canopies, sculptural pavilions, feature stairs, bridges inside malls and offices, shade structures for public spaces, landmark signage and rooftop features on villas and towers all tend to need custom metal structures. Whether the job is a bespoke steel canopy in Riyadh, a pergola in Jeddah or a pavilion in Dammam, the climate adds its own demands, from strong sun and wide day-to-night temperature swings inland to salt-laden air on the coast.
This guide is for architects, developers, consultants and contractors planning bespoke structures in the Kingdom. It explains what separates bespoke structures from standard ones, how a project moves through the nine stages, how thermal movement is calculated, which decisions drive cost and schedule, and what to prepare before approaching a fabricator. It is written from the fabrication side. Rounuq Almsar designs, fabricates and installs architectural metal structures from its facility in Riyadh, and the points below follow the questions that come up once a concept reaches the engineering and workshop stages.
Bespoke structures are structures designed and fabricated for one specific project, rather than selected from a standard product range or a pre-engineered system. Their geometry, materials, connections and finishes are developed around the architect’s design and the site’s conditions. The same idea appears under other names: custom structures, custom steel fabrication, bespoke metalwork and architectural steel structures. In practice the terms are interchangeable, and a brief that says custom metal structures, bespoke metalwork or bespoke steel structures is describing the same scope.
In metalwork, bespoke steel structures usually means architectural structures where appearance and engineering carry equal weight. The steel is exposed and forms the visible design, so every weld, joint and finish is judged by eye as well as by calculation.
| Typical bespoke structure | What makes it bespoke | Related page |
|---|---|---|
| Entrance canopies and free-form shade structures | Cantilevers, curved edges, exposed connections | Steel pergolas and architectural structures |
| Pergolas and garden pavilions | Site-specific geometry, mixed materials | Steel pergolas and architectural structures |
| Feature and spiral staircases | Helical geometry, stringer and tread detailing | Spiral staircases |
| Pedestrian bridges, internal and external, including atrium bridges | Span, deflection and vibration control | Custom metal projects |
| Skylight and glazing support frames | Tight tolerances, glass movement | Facade and glazing solutions |
| Landmark signage, gateways, monuments | One-off shapes, laser-cut elements | Laser cutting |
| Handrails and balustrades with a visible role | Continuous lines, polished welds | Handrails |
| Screens, frames and facade supports | Repeated custom modules | Stainless steel cladding |
Briefs, tenders and drawings mix English and Arabic vocabulary. This table lists the terms used around bespoke structures so that a brief, a bill of quantities and a shop drawing all mean the same thing.
| English term | Arabic term | Meaning in a bespoke structures brief |
|---|---|---|
| Bespoke structures | هياكل معمارية مخصصة | Structures designed and built for one project |
| Custom metal structures | هياكل معدنية مخصصة | The same scope, described by material |
| Bespoke steel structures | هياكل حديدية حسب الطلب | Steel-framed architectural structures |
| Architectural steel structures | هياكل حديد معمارية | Exposed steel where appearance matters |
| Steel fabrication | تصنيع الحديد | Cutting, forming, welding and assembly in the workshop |
| Steel canopy | مظلة حديد | Entrance, drop-off or shade structure |
| Steel pergola | برجولة حديد | Open frame for gardens, terraces and walkways |
| Spiral staircase | سلم حلزوني | Helical stair around a central column or open core |
| Pedestrian bridge | جسر مشاة | Walkway linking buildings or crossing an atrium |
| Skylight frame | هيكل مناور | Steel or aluminum frame that carries glass overhead |
| Shop drawings | رسومات التصنيع | Drawings for every part, weld and connection |
| Hot-dip galvanising | جلفنة بالغمس الساخن | Zinc coating applied by dipping fabricated steel |
| Powder coating | طلاء بودرة | Baked colour finish over galvanised or bare metal |
| Base plate | صفيحة قاعدة العمود | Plate that spreads a column load into the foundation |
| Anchor bolts | مسامير التثبيت بالخرسانة | Bolts that tie the base plate to the foundation |
| Thermal expansion | التمدد الحراري | Length change of a member with temperature |
| Wind load | حمل الرياح | Pressure and uplift from wind on a structure |
| Saudi Building Code | كود البناء السعودي | The national code set, with SBC 301 and SBC 306 |
| Stainless steel | ستانلس ستيل | Corrosion-resistant steel for exposed details |
| Structural glazing | زجاج إنشائي | Glass fixed with structural silicone or mechanical fixings |
Saudi Arabia has a well-established pre-engineered building industry, and for warehouses and plain industrial sheds that is usually the right answer. Bespoke structures make sense when a standard system cannot deliver the geometry, the finish or the integration the design needs. The lead time is longer because design development and shop drawings come before any steel fabrication starts.
| Factor | Bespoke structures | Pre-engineered buildings | Catalogue or modular products |
|---|---|---|---|
| Design freedom | Full | Limited to system rules | Very limited |
| Typical use | Architectural features, landmarks, complex geometry | Warehouses, factories, large plain spans | Carports, kiosks, standard shades |
| Engineering | Project-specific calculations and connections | Standard frames, sized per project | Pre-designed |
| Visible finish quality | High, often exposed | Functional | Varies |
| Lead time | Longer, includes design development | Shorter for standard layouts | Shortest |
| Cost per tonne | Higher | Lower | Lowest |
| Best when | Design intent matters as much as function | Speed and economy come first | Needs match a stock product |
The right question for any bespoke structures project is whether the design actually needs to be custom. If it does, forcing it into a standard system usually costs more in compromises than it saves. If it does not, a standard system is the more economical choice and a good fabricator will say so.
Hotels, restaurants and malls use bespoke structures to create arrival moments: entrance canopy designs, canopies over drop-off lanes, drop-off shelters, atrium bridges and feature stairs. These pieces are exposed on all sides, so connections, welds and finishes are visible to guests. Our guides to hotel metalwork and airport metalwork cover how the same custom approach applies to high-traffic public buildings.
Corporate projects commission feature staircases, internal bridges, skylight frames and glazed links. On the Nawafez Trading Offices project in Riyadh, delivered in 2023, the scope covered a curtain wall, structural glazing, aluminum cladding and a skylight on the envelope, plus staircases, a bridge, metal and glass handrails and a pergola. It is a typical mix for a custom office package, where bespoke structures sit alongside envelope work and have to be coordinated with it.
High-end villas often include pergolas, roof terraces, spiral stairs, entrance gates and outdoor structures that tie into the landscape. For stairs, our overview of luxury spiral staircases explains how the structure and cladding are designed together.
Parks, boulevards, cultural districts and large developments commission shade structures, signage, gateways and access structures at scale. The same bespoke structures logic applies, with one addition: repetition. A shade structure repeated forty times rewards investment in a tuned module, jigs and a standard connection, while a one-off gateway rewards investment in design development and mock-ups. Browse completed work in the Rounuq portfolio.
Every custom project follows roughly the same path. The earlier each stage is resolved, the smoother the next one runs. The table shows what each stage produces and who normally owns it.
| # | Stage | Main output | Usually led by | Common failure if rushed |
|---|---|---|---|---|
| 1 | Concept and brief | Design intent, site data, budget, programme | Architect and client | Scope changes after pricing |
| 2 | Design development | Geometry, materials, finishes, structural concept | Architect with fabricator input | Details that cannot be built or transported |
| 3 | Structural engineering | Loads, member sizes, connections, foundation loads | Consultant or fabricator’s engineer | Late member increases that spoil the look |
| 4 | Shop drawings | Drawings for every part, connection and assembly | Fabricator | Clashes found in the workshop or on site |
| 5 | Mock-ups and samples | Finish samples, physical mock-up of complex nodes | Fabricator, approved by consultant | Appearance disputes at handover |
| 6 | Fabrication | Cut, formed, welded and trial-fitted assemblies | Fabricator | Fit problems that reach site |
| 7 | Surface treatment | Galvanising, paint, powder coat, PVD or other finish | Fabricator or approved applicator | Coating damage, poor edge cover |
| 8 | Delivery and installation | Transport, lifting, erection, site welding or bolting | Fabricator or installer | Pieces that do not fit the truck or the access route |
| 9 | Inspection and handover | Checks against drawings and specification | Consultant and contractor | Snag lists that run for months |
At the first stage, early fabricator input can save a lot of redesign later. At the second, the structural concept is agreed together with the materials, so the engineer is not asked to make a thin member carry a load it was never meant to carry.
In bespoke structures work, concept drawings show what a structure should look like. Shop drawings show exactly how it will be made. They cover every plate, bolt, weld, tolerance and interface with other trades.
For bespoke structures this is where most problems are caught. A connection that looks elegant in a render may be impossible to weld on site, and a curved member may need splitting into transportable lengths. Modelling matters here. Rounuq lists BIM (building information modelling), CAD, Tekla, Revit, IDEA StatiCa and Staad.Pro among its engineering tools, which allow complex connections to be modelled and checked before any steel is cut. When you assess a fabricator, ask to see a shop drawing set from a comparable job, not only a render.
A finish sample on a small plate cannot show how a polished weld reads on a 3 m rail, or how a curved canopy edge catches the light. For exposed bespoke structures, a full-scale mock-up of the most visible node is cheap compared with replacing a finished assembly. Agree the mock-up as a hold point, with the approval recorded, so that the approved version is what gets built.
Material choice for bespoke structures drives cost, weight, appearance and durability. Most custom metal structures use one material or a combination of the following.
| Material | Best for | Main caution | Further reading |
|---|---|---|---|
| Structural steel | Primary frames, columns, beams, anything carrying significant load | Needs corrosion protection outdoors | Metal manufacturing |
| Stainless steel | Exposed feature elements, handrails, cladding, details | Grade must match exposure, especially on the coast | Stainless steel cladding |
| Aluminum | Cladding, louvres, secondary framing, lightweight skins | Lower stiffness than steel, higher thermal movement | Facade and glazing solutions |
| Corten steel | Landscape pieces and sculptural structures inland | Run-off staining, not a safe default everywhere | Corten steel |
| Copper and decorative metals | Accent panels and feature finishes | Cost, patina change, rarely primary structure | PVD finish |
| Glass and glazing | Canopies, skylights, bridges, pavilions | Steel and glass must be designed together | Facade and glazing solutions |
Structural steel, often rectangular and circular hollow sections plus plate, is the default for primary frames. It is strong, weldable and economical, but it needs corrosion protection outdoors. Hot-dip galvanising to ISO 1461 is a common baseline. ISO 1461 specifies the general properties of coatings applied by dipping fabricated iron and steel articles in a zinc melt, and the current edition is ISO 1461:2022. A paint or powder-coat system is often applied over the zinc when colour is needed. Cut edges, weld zones and site joints need a repair coating, so galvanising specifications should say who repairs them and to what standard.
Grade selection depends on exposure. The BSSA guidance on selecting stainless steels for external applications is a useful reference for outdoor and coastal work, and our guide to stainless steel cladding covers finishes such as mirror, hairline and PVD. For rails and balustrades, see the stainless steel handrails guide.
Aluminum is lighter and naturally corrosion-resistant, which suits cladding, louvres and secondary framing. It is less stiff than steel, so primary spans usually stay in steel with aluminum used for the visible skin. Its thermal expansion is roughly double that of steel, which the worked example below puts in numbers.
Corten is popular for landscape pieces and sculptural structures inland, but it is not a safe default everywhere. Our article on corten steel in Saudi Arabia explains where it performs well and where it causes staining or corrosion problems.
Many bespoke structures carry glass: canopies, skylights, bridges and pavilions. The steelwork and glazing need to be designed together so deflections, fixings and drainage work for both. Where glazing is a major element, it normally connects to a wider facade and glazing system.
Not every bespoke steel structure fails in the same way. Knowing which check governs a type tells the designer where to spend effort and the fabricator where to spend tolerance.
| Type of bespoke structure | Governing check | Typical material | Usual finish |
|---|---|---|---|
| Cantilever entrance canopy | Deflection at the tip, uplift, base plate and anchor bolt design | Structural steel hollow sections and plate | Galvanising plus paint or powder coat |
| Free-form shade structure | Wind uplift on large areas, connection fatigue in gusts | Rolled tubes, plate nodes | Galvanising plus powder coat |
| Pergola and pavilion | Slenderness, lateral stability, drainage at joints | Steel or aluminum sections | Powder coat or PVD |
| Spiral staircase | Vibration, stringer and tread stiffness, handrail loads | Steel with stainless or glass balustrade | Paint, brushed stainless or PVD |
| Pedestrian bridge | Span, deflection and walking vibration | Steel box or truss with glass or timber deck | Paint system or galvanising |
| Skylight and glazing frame | Movement tolerance, water tightness, glass deflection | Steel with aluminum cappings | Powder coat or anodising |
| Gateway, monument or sign | Overturning, base fixity, lettering fixings | Plate, laser-cut steel or stainless | Paint, patina or PVD |
| Screen, louvre or facade support | Repetition, fixing tolerance, thermal movement | Aluminum or steel | Anodising or powder coat |
The finish decides how a bespoke structure ages. A finish that is correct inland can fail within a few years on the coast, so match the system to the exposure and not only to the colour card.
| Finish | Best for | Watch out for | Related page |
|---|---|---|---|
| Hot-dip galvanising | Primary steel outdoors | Distortion of thin plate, bath size limits, vent and drain holes | Metal manufacturing |
| Wet paint (epoxy primer, polyurethane topcoat) | Colour on steel, site touch-up | Edge cover and film thickness on sharp corners | Metal manufacturing |
| Powder coating | Even colour on pergolas, canopies and screens | Part size limited by the oven, chipping at site joints | PVD finish |
| PVD coating | Gold, bronze, black and other metallic tones on stainless | Applied to parts that fit the chamber | PVD finish |
| Brushed or mirror stainless | Handrails, cladding, feature details | Fingerprints, tea staining near the coast | Stainless steel handrails |
| Anodising | Aluminum cladding, louvres, frames | Colour variation between batches | Facade and glazing solutions |
| Weathering steel patina | Sculptural and landscape pieces | Run-off staining on paving and walls | Corten steel |
For paint systems, ISO 12944 is the standard family usually cited for corrosion protection of steel structures by protective paint systems, and it classifies environments by corrosivity. Ask the consultant which corrosivity category the specification assumes for the site.
Plain definitions help non-engineers on the client side follow shop drawings and fabrication submittals.
| Term | Meaning |
|---|---|
| RHS, SHS, CHS | Rectangular, square and circular hollow sections, the usual members in canopy and pergola frames |
| I-beam and channel | Open rolled sections used for beams and stringers |
| Truss | A frame of triangulated members that spans far with little steel |
| Cantilever | A member fixed at one end and free at the other, typical in entrance canopies |
| Gusset | A plate that joins members at a node |
| Splice | A joint that connects two lengths of the same member, often at a site joint |
| Moment connection | A connection that transfers bending, needed at cantilever roots |
| Pinned connection | A connection that transfers force but allows rotation |
| Stringer | The inclined beam that carries stair treads |
| Balustrade | The guarding system of rail, posts and infill beside a stair or bridge |
| Camber | A built-in upward curve that offsets expected deflection |
| Tolerance | The permitted deviation in size or position |
Bespoke structures still have to meet the same structural requirements as any other building element. In the Kingdom that means the Saudi Building Code (SBC), which has separate parts for loads and forces (SBC 301) and for steel structures (SBC 306), with further parts for areas such as foundations and cold-formed steel. The Saudi Building Code overview summarises the full set and its scope. Editions change, so confirm with the consultant which edition the project has adopted before calculations start.
| Check | What to confirm | Why it matters for bespoke structures |
|---|---|---|
| Loads and forces (SBC 301) | Dead, live, wind and seismic loads, and the load combinations | Open canopies and signage are governed by wind, not self-weight |
| Steel design (SBC 306) | Member checks, connection design, fabrication and erection requirements | Exposed connections are both structural and visual |
| Foundations | Soil data, overturning and uplift reactions | Freestanding structures transfer large moments to the ground |
| Fire | Whether the structure sits inside a fire-rated zone | Covered walkways and bridges between buildings can be affected |
| Glazing and fixings | Deflection limits and movement allowances | Glass tolerates far less movement than steel |
Thermal movement is easy to ignore on a drawing and hard to ignore on site. The change in length of a member is its length times its coefficient of thermal expansion times the temperature change, written ΔL = α × L × ΔT.
Take a 20 m long member and assume a 40 °C swing between its coolest and hottest metal temperature over a day or a season. The coefficients below are typical handbook values; confirm the figure for the exact grade and alloy.
| Material | Typical α (per °C) | Calculation | Change in length |
|---|---|---|---|
| Carbon steel | 12 × 10⁻⁶ | 20,000 mm × 12 × 10⁻⁶ × 40 | 9.6 mm |
| Austenitic stainless steel | 17 × 10⁻⁶ | 20,000 mm × 17 × 10⁻⁶ × 40 | 13.6 mm |
| Aluminum | 23 × 10⁻⁶ | 20,000 mm × 23 × 10⁻⁶ × 40 | 18.4 mm |
Two points follow. First, a rigidly fixed 20 m aluminum rail that cannot move will push roughly 18 mm of movement into whatever restrains it, which is why slotted holes, sliding bearings and expansion joints appear on the shop drawings of well-detailed bespoke structures. Second, mixed-material assemblies move by different amounts. A steel frame carrying an aluminum skin needs a connection that lets the skin slide relative to the frame. Metal surfaces in direct Saudi sun can run much hotter than the air, so the 40 °C swing is an assumption to replace with project data from the consultant.
Bespoke structures are only as good as the steel fabrication workshop that builds them, and a workshop that does only standard steel fabrication will struggle with architectural tolerances. The capabilities below are the ones worth checking, and the right-hand column shows how to check them.
| Capability | Why it matters | How to verify |
|---|---|---|
| Laser cutting | Plates, gussets and decorative panels with clean edges | Ask for sample cuts. See our laser cutting guide |
| CNC bending and forming | Folded plates and formed sections to repeatable tolerances | See custom metal forming |
| Rolling | Curved beams, arches and tubes | Ask for a rolled sample at your radius |
| Welding by qualified welders | Strength and a finish that survives close inspection | Ask for welder qualification and the welding procedures used |
| Trial assembly (a full fit-up before dispatch) | Fit problems appear in the workshop, not on site | Agree a trial-fit hold point before dispatch |
| In-house finishing, such as PVD | One party answers for appearance | See the PVD finish page |
Rounuq’s Riyadh facility includes laser cutting, CNC bending, rolling, welding and PVD finishing, which covers most of the processes a typical architectural structure needs. The workshop page gives more detail on the equipment.
Exposed bespoke steel structures are inspected by eye long before they are tested by load, so weld quality is both a structural and a visual requirement. The points below are common practice for steel fabrication, and the consultant’s specification decides which standard and inspection level applies.
| Item | Typical requirement | Why it matters |
|---|---|---|
| Weld type | Full-penetration butt welds at primary nodes, fillet welds elsewhere | Strength and fatigue under wind gusts |
| Weld finish | Ground flush on exposed faces, as-welded on hidden faces | Appearance and coating adhesion |
| Welder and procedure records | Qualified welders and approved welding procedures | Traceability if a weld is questioned |
| Visual inspection | Every weld, before coating | Finds undercut, porosity and missing returns |
| Surface testing | Dye penetrant or magnetic particle testing on selected welds | Finds cracks that the eye misses |
| Volumetric testing | Ultrasonic testing on critical full-penetration welds | Checks inside the weld |
| Dimensional tolerances | Agreed in the specification and checked during trial assembly | Joints align on site without forcing |
| Bolt tightening | Recorded for structural bolted connections | Evidence of the connection’s condition |
Agree the weld grinding standard on the mock-up, not on the finished structure, so that everyone has seen the accepted appearance.
This is where many bespoke structures run into trouble late. Every piece has to fit on a truck, through site access and, if galvanised, into the galvanising bath. A long curved beam that looks continuous in the render may need to be split, with site joints hidden or expressed deliberately.
| Question to settle during design | Why |
|---|---|
| What is the maximum piece size for transport and site access? | Splits and site joints follow from it |
| Where will site joints go, and will they be bolted or welded? | Site welding needs access, power and a repair coating |
| Can large assemblies be galvanised in one dip, or must they be split? | Bath dimensions differ between galvanisers, so ask the one you will use |
| Which lifting equipment will the site allow? | Crane reach and ground bearing limit assembly size |
| How will finished surfaces be protected during installation? | Scratches and weld spatter on a final finish are expensive to fix |
Plan these questions during design, not after, and put the answers into the design-and-build programme. A structure that is perfect on screen but cannot be dipped, lifted or driven to site is a redesign waiting to happen.
Custom work is priced on design, engineering and labour as much as on material. The cost per tonne is higher than for pre-engineered buildings because so much of the price sits in drawings, setting out, welding and finishing rather than in the steel itself.
| Cost driver | Effect | How to control it |
|---|---|---|
| Geometry | Curves, twists and non-repeating members take far more time than straight, repeated ones | Use curves where they are seen and straight members where they are not |
| Connections | Hidden or sculpted connections cost much more than standard bolted plates | Standardise connections, expose the honest ones |
| Finish level | Exposed, ground and polished welds are labour-intensive | Specify the premium finish only on visible faces |
| Repetition | Ten identical canopies cost much less per unit than ten different ones | Repeat one module across the project |
| Material mix | Stainless and copper cost more than carbon steel, and mixed materials add interface work | Keep premium metals for the visible skin |
| Site conditions | Access, lifting, working at height and night work all add cost | Share site access data at briefing |
The best way to control cost is to involve the fabricator during design development, when changes are still cheap. Small decisions, such as repeating a module or standardising a connection, can save more than any negotiation on price.
A useful enquiry for bespoke structures includes:
| Item | Detail to include |
|---|---|
| Drawings | Architectural drawings or 3D models, even at concept stage |
| Location | City, and whether the site is inland or coastal |
| Use and loads | Loads beyond self-weight, such as people, glazing or signage |
| Materials and finishes | Preferred materials, with reference images if possible |
| Engineering responsibility | Whether the consultant provides it or the fabricator must |
| Programme | Any fixed opening dates |
| Scope | Fabrication only, or fabrication plus installation |
It is also worth asking the fabricator for comparable past work and whether shop drawings, engineering and finishing are handled in-house. Do not skip the last question. A fabricator that outsources all three becomes a coordinator, and every handoff adds days and creates room for error.
In practice the terms are used interchangeably. Both mean structures designed and built for one specific project rather than chosen from a standard range.
Usually yes, per tonne of steel. A bespoke structure can still be the better value when a standard system would compromise the design, the site fit or the building’s identity.
It depends on complexity. The design, engineering and shop drawing stages often take as long as fabrication itself, so involving the fabricator early shortens the overall programme.
That depends on the contract. Sometimes the consultant’s engineer designs the structure and the fabricator details it. On design-and-build packages, the fabricator’s engineers take responsibility for the calculations, which the consultant then reviews.
The Saudi Building Code applies, including SBC 301 for loads and forces and SBC 306 for steel structures, alongside any project-specific requirements from the consultant or authority. Confirm the adopted edition at the start of the project.
For carbon steel, hot-dip galvanising with a paint or powder-coat topcoat is a common, durable choice. Stainless steel and aluminum suit exposed feature elements. The right system depends on the site’s exposure, which differs between inland Riyadh and coastal Jeddah or Dammam.
Yes. Canopies, skylights, bridges and pavilions often combine steel and glass, but the two must be designed together so movement, fixings and drainage work for both.
As early as possible, ideally during design development. Early input on geometry, connections, transport and finishes prevents redesign later.
A bespoke steel canopy is an entrance, drop-off or shade structure designed for one building. Its cantilever, curve or exposed connections do not come from a catalogue, so it gets its own calculations, shop drawings and finish.
Hollow sections (RHS, SHS and CHS) are the most common in canopies and pergolas. I-beams, channels and plate appear in beams, stringers and nodes, and trusses are used where a long span needs to stay light.
Every weld gets a visual check. Selected welds then get dye penetrant or magnetic particle testing, and critical full-penetration welds may get ultrasonic testing. The specification sets the extent.
Hot-dip galvanising with a high-build paint system is common for carbon steel, while grade 316 stainless or anodised aluminum suits exposed details. Confirm the corrosivity category with the consultant for the specific site.
It matters on any long exposed member. Under the assumptions in the worked example above, a 20 m carbon steel member moves about 9.6 mm and an aluminum one about 18.4 mm, so connections must be detailed to allow it.
Bespoke structures are where architecture and engineering meet in plain sight. When design, engineering, fabrication and installation are planned together, a custom canopy, stair or pavilion can become the most memorable part of a project. When they are treated as separate steps, the same structure becomes a source of delays and compromises.
If you are planning a custom canopy, pergola, staircase, bridge, pavilion or other architectural structure, explore our steel pergolas and architectural structures service, or send your drawings and site details to the Rounuq Almsar team for a review of the design, engineering approach and fabrication cost.